Plant Engineering Projects

Plant Engineering

PROJECT DESCRIPTION

The company was building conveyor systems for the sugar industry, mining industry and other industries.
Each project was a tailor manufactured conveyor system according to customer needs and had a lead time about 6 to 7 month after customer order with a fixed dead line. To ensure the maximum efficiency and profit for the customer the conveyor systems had to be in service at harvest time of the sugar beans. A delay caused a reduced output of sugar for the customer.
From Engineering to putting into service of the system, everything was manufactured in-house or with company personnel. Only small parts of the projects were outsourced in case of capacity shortage.
For 15 years the company wasn’t able to finalize projects in budget or time.

PROJECT PLANNING and EXECUTION

Reviewing the history of the project management it was revealed that modern project management techniques were not used and communication between the involved departments hadn’t been carried out effective enough.
New projects were planned in detail in MS Project. Regular project meetings were hold and the progress of the tasks were monitored on a daily base.

Target

Target:

Improve Project Management

Toolbox

Tool Box:

Project Management, Team Work, Lean Manufacturing, Leadership

Achievement

Achievements:

After 15 years the first project (Order value: 3 Mio. DM) was finished in time and budget.


PROJECT DESCRIPTION

The client in Shanghai realized that 5S is important to increase efficiency and ordered a 2 day 5S training.

PROJECT PLANNING and EXECUTION

Monitoring and advising the management of the company on issues during the construction and installation. Perform training sessions and day to day coaching of the management and employees on daily tasks. Reporting to the local headquarter in Shanghai.

Target

Target:

Improve 5S performance

Toolbox

Tool Box:

5S & Safety Training, 5S Checklist, 5S Shop Floor Management

Achievement

Achievements:

Training Satisfaction of the client and his employees "Excelent"

Follow up orders for further training


PROJECT DESCRIPTION

SMED Workshop at a German company in Shanghai to reduce change over times and increase capacity.

PROJECT PLANNING and EXECUTION

3-Day SMED Workshop with training, observation of current status including “spaghetti” diagram, brainstorming, definition of action list and implementation of actions and improvements.

Target

Target:

Reduce Change over times to gain capacity for a new customer

Toolbox

Tool Box:

Training, Coaching and Implementation
SMED Techniques
5S & Safety
Team Work

Achievement

Achievements:

Reduction of Change over time of 56%
Capacity for new customer achieved (possible 50% more turn over during the first year after implementation) – the client did get the order from their potential customer.


PROJECT DESCRIPTION

A well-known German manufacturer realized that the Production Management needs to improve to be enabled to manage projects more efficient and reliable.

PROJECT PLANNING and EXECUTION

After an assessment of the current knowledge in modern production, maintenance and quality management a four-month training and coaching program was started. During the 4 month we performed training and coaching sessions (1 to 2 days per week).

Target

Target:

Improvement of:
• Production Management
• Maintenance Management
• Safety Management
• Quality Management

Toolbox

Tool Box:

Determination of Times (MTM, Refa),
Critical Path determination, Gantt Chart / MS Project, Production Control Boards,
Risk Assessment,
6S and Shop Floor Management
Achievement

Achievements:

Efficiency of Production Management improved
TPM Implementation, Maintenance Plans and Work Instructions created, Maintenance Signs on machines implemented
4 Risk Assessments performed, Machine Safety Guards installed, General Safety Awareness increased
Production WI introduced, Traceability Documentation introduced


PROJECT DESCRIPTION

Together with our partner in Wuxi a world leading glass-lined steel agitation systems manufacturer needed to increase the capacity of their facility, caused by the market demands.

PROJECT PLANNING and EXECUTION

To find the potentials for possible capacity increases the current capacity planning was analyzed by studying BOMs, Drawings, Process Flow and Production Planning.

Target

Target:

Analyze the As-is situation and deliver improvement suggestions

Toolbox

Tool Box:

ERP
Capacity Calculation
KPI

Achievement

Achievements:

Improvement Proposal for 4 phase project creating:
• ERP Manufacturing BOMs
• ERP Standard Routings
• Create Manufacturing Drawings to reduce operator work times
• Implement ERP
• Analyze ERP solution
Follow-Up Order for the 1st phase of the proposed project


 